CASTEL DEL MONTE GEOMETRIC CONSTRUCTION PAGE 3.

CAUTION!!- UNDER GEOMETRIC CONSTRUCTION

LOCATE MORE POINTS

Points S, X and P should be labeled next to help with construction of outer sides of the Castle tower.

FIGURE 1.



You may wish to make these drawings with your computer drawing software.

LINE CONSTRUCRIONS AND MORE POINTS LABELED

Construct the following line segments but extend the line segments to the outer lines: {S, P2}, {X, P3} and {P2, V}.

Label the following points after construction of these line segments: P11, P12, Q and E.

CONSTRUCTION(S) 6.



Construct the following line segments but extend the line segments to the outer lines: {P11, P}, {X, P3} and {P2, V}.

Label the following points after construction of these line segments: P13, P14 and L.

LAST TWO OUTER WALLS OF THIS CASTLE TOWER

Construct the line segment {P13, G} and extend the line segment to the outer lines.

Label the point C.

CONSTRUCTION(S) 7.

Click on the last drawing or here to see the next stage construction of Castel Del Monte.

Click on math page to see how this construction of Castel Del Monte starts.

Click on myhome page to see what my Castel Del Monte project looks like.

Copyright © 2002 notice
= a